, 5 min read
How to track job costs in construction
Job costing means comparing what a job was bid to cost against what it is actually costing, line by line, while there is still time to do something about it.
See the overrun while you can still do something about it.
When a bid is awarded its line items become the budget. Costs are recorded against them as the work is done, and each line shows how much of its budget is gone.
60-day free trial. No credit card required.

The bid lives in one spreadsheet and the costs live in the accounting system, coded differently. Putting the two side by side is a job in itself, so it happens after the project closes. By then the number is a post-mortem, not a warning.
There is nothing to set up when a job is won. The line items you bid become the lines you track, with the cost you estimated for each as its budget.
Record material, labor, equipment, subcontractor and miscellaneous or contingency costs against the line item they were spent on. Labor and equipment hours entered on the timesheet arrive here on their own.
Look at the job by cost type to see whether labor or materials is running over, or by line item to see which part of the work is. A line turns orange when it has used 80% of its budget and red when it goes over.
, 5 min read
Job costing means comparing what a job was bid to cost against what it is actually costing, line by line, while there is still time to do something about it.
, 5 min read
The same job costs can be cut two ways. One tells you what kind of money is going out, the other tells you which piece of work is taking it. You need both, and here is why.
, 5 min read
A line at 80 percent of its budget is either nearly finished or in trouble. A few questions tell you which, and what you can still do about it.
, 5 min read
Material, labor, equipment, subcontractor and miscellaneous. What belongs in each, where costs commonly get put in the wrong one, and why it matters for the next bid.
, 5 min read
The bid lives in one place, the costs in another, under different names and on a different schedule. That gap is why the bad news arrives when nothing can be done about it.
, 5 min read
A job cost report nobody reads changes nothing. A short standing meeting each week, with a fixed order and a short list of decisions, is what turns the numbers into action.
, 5 min read
Hourly people cost a job by the hour. Salaried people cost the same whatever they do, which makes it easy to leave them out of job cost or count them twice.
This is one part of BidDig. For how the parts work together, see Construction job costing software.
Set up your catalog, build a bid and send the proposal. Then watch the job against the bid as the costs come in.
60-day free trial. No credit card required.