Budget vs actual job cost tracking

See the overrun while you can still do something about it.

When a bid is awarded its line items become the budget. Costs are recorded against them as the work is done, and each line shows how much of its budget is gone.

Start free trial

60-day free trial. No credit card required.

Budget vs cost by line item in BidDig: total budget and total costs, then a budget bar and cost bar for each header and line item, with one line over budget in red.

What goes wrong without it

The bid lives in one spreadsheet and the costs live in the accounting system, coded differently. Putting the two side by side is a job in itself, so it happens after the project closes. By then the number is a post-mortem, not a warning.

The awarded bid is the budget

There is nothing to set up when a job is won. The line items you bid become the lines you track, with the cost you estimated for each as its budget.

  • The budget is your estimated cost before markup, so you are comparing cost with cost.
  • No second set of cost codes to keep in step with the estimate.

Five kinds of cost, recorded where they belong

Record material, labor, equipment, subcontractor and miscellaneous or contingency costs against the line item they were spent on. Labor and equipment hours entered on the timesheet arrive here on their own.

  • Material, labor, equipment, subcontractor and contingency costs.
  • Hours from the field feed the same job cost.

Two views of budget vs actual

Look at the job by cost type to see whether labor or materials is running over, or by line item to see which part of the work is. A line turns orange when it has used 80% of its budget and red when it goes over.

  • Budget vs actual by cost type and by line item.
  • Orange from 80% of budget, red above 100%.
  • A budget bar and a cost bar for every header and line item.

Reading on job costing

, 5 min read

How to track job costs in construction

Job costing means comparing what a job was bid to cost against what it is actually costing, line by line, while there is still time to do something about it.

, 5 min read

The five cost types in construction job costing

Material, labor, equipment, subcontractor and miscellaneous. What belongs in each, where costs commonly get put in the wrong one, and why it matters for the next bid.

, 5 min read

The weekly job cost review meeting for contractors

A job cost report nobody reads changes nothing. A short standing meeting each week, with a fixed order and a short list of decisions, is what turns the numbers into action.

This is one part of BidDig. For how the parts work together, see Construction job costing software.