, 5 min read
Why contractors find out a job lost money after it is over
The bid lives in one place, the costs in another, under different names and on a different schedule. That gap is why the bad news arrives when nothing can be done about it.
Everything on the blog about reporting.
, 5 min read
The bid lives in one place, the costs in another, under different names and on a different schedule. That gap is why the bad news arrives when nothing can be done about it.
, 5 min read
Every finished job is a record of what your crews and prices actually did. Comparing bid lines with actual costs, and feeding the result into your rates, is how estimates get better.
, 6 min read
A job cost report is four columns per line: budget, actual, remaining and percent used. Here is an example report read line by line, and what to do about what each line shows.
, 5 min read
The same job costs can be cut two ways. One tells you what kind of money is going out, the other tells you which piece of work is taking it. You need both, and here is why.
Set up your catalog, build a bid and send the proposal. Then watch the job against the bid as the costs come in.
60-day free trial. No credit card required.